The Low Barns Volunteer Task Force
Hedleyhope Fell: Access works (Tue 22nd Sep 2009)
22nd September 2009

Today we repaired steps on the long distance footpath on the fell, removed old fencing and repaired a surfaced footpath.

<-- Index | Showing 1-15 of 15 pictures | Index -->
Peter working on the steps
Peter working on the steps
2009-09-22 10:16:20
Peter scraping gravel back on the steps
Peter scraping gravel back on the steps
2009-09-22 11:38:17
Stu and Kelvin working on the lower steps
Stu and Kelvin working on the lower steps
2009-09-22 11:38:34
Stu, Jimmy and Peter looking very serious
Stu, Jimmy and Peter looking very serious
2009-09-22 12:18:24
Kelvin
Kelvin
2009-09-22 12:18:29
Peep'o Emma
Peep'o Emma
2009-09-22 12:19:28
Kelvin and Stu
Kelvin and Stu
2009-09-22 12:44:54
Emma clearly delighted at having yet another photo taken
Emma clearly delighted at having yet another photo taken
2009-09-22 12:52:09
Removing old fencing
Removing old fencing
2009-09-22 12:52:14
Jummy and Emma carrying the old fencing away
Jummy and Emma carrying the old fencing away
2009-09-22 12:52:41
Now on to road repairs
Now on to road repairs
2009-09-22 14:19:37
Repairing the roadway on the fell
Repairing the roadway on the fell
2009-09-22 14:19:47
Jimmy, Stu, Emma and Peter hard at work
Jimmy, Stu, Emma and Peter hard at work
2009-09-22 14:20:06
Filling the barrow with hard core
Filling the barrow with hard core
2009-09-22 14:30:37
Emma
Emma
2009-09-22 14:30:52